Guide
What to ask before you sign anything
Every contractor will answer these. The differences between the answers are where the useful information is.
Get it looked at
Three questions, and up to three Yorba Linda contractors. Free either way.
Your request is in.
We are matching it now against roofing contractors working in Yorba Linda and the surrounding area.
- Today, usually within the hour. The first contractor calls or texts the number you gave us. ASAP requests go out first.
- Up to three of them, no more. We cap it at three so you can compare without your phone melting.
- They come and look. Estimates are given after somebody has been on the roof, not over the phone.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
If you do not hear anything today, check your voicemail and spam folder — contractors often call from a mobile number.
"Who is actually doing the work?"
Ask how long this specific crew has worked together. Roofing companies keep their name and change their hands more often than most trades.
"What is your licence number, and who holds it?"
Then look it up. You are checking that the licence is current and that the name on it matches the name on the contract you are being asked to sign.
"What underlayment, and how are the valleys done?"
This is the question that reveals whether you are comparing the same roof. Underlayment, ice-and-water placement, drip edge and valley treatment are where quotes quietly diverge.
"What does your workmanship warranty cover, and for how long?"
Material warranties come from the manufacturer and are conditional on correct installation. The workmanship warranty is the contractor's own promise, and it is worth exactly as much as the company behind it.
"What happens if the decking is rotten?"
You want a rate, not a reassurance. Some rot is likely on any older roof and the rate is the only thing that keeps that predictable.
"Can I see a job you finished five years ago?"
Recent work shows tidiness. Older work shows competence. Ask for the older one.
In short
Write the answers down. Two weeks later, when the quotes have blurred together, the notes are what you will actually decide on.
Related questions
How much deposit is normal?
Ten to thirty per cent is ordinary, and is often used to order material. A demand for full payment up front is a reason to walk away.
How long should a roof last here?
An architectural asphalt roof is rated for twenty-five to thirty years and, in this climate, tends to land at the lower end of that. Tile and metal go much further, provided what is underneath them is maintained.
What time of year is best to re-roof in Yorba Linda?
Practically, the long dry run from May to October. Crews are busiest right after the weather turns — November through March — so booking outside that stretch usually buys you a better date and a keener number.
Ready for a real number?
Three questions, about a minute, and up to three Yorba Linda contractors come back to you.